Project

Hong Kong International Airport Expansion Terminal 2

Hong Kong
Project Hero Image

Overview

The expansion of Terminal 2 (T2) at Hong Kong International Airport (HKIA) is a significant component of the HK$141.5 billion initiative to transform HKIA from a two-runway to a three-runway system. This ambitious project aims to enhance the airport's capacity and streamline passenger and baggage flow through advanced architectural design.

GELEC's Contribution:

  • Fire and Smoke Safety: Provided TROX Motorised Fire and Smoke Dampers to enhance safety and fire response within the terminal.
  • Smoke Control Solutions: Supplied 2000 units of G1K1 Automatic Smoke Curtains, contributing to the overall safety and compliance of the terminal.
  • Enhanced Protection: These installations are critical in maintaining a safe environment, crucial for the wellbeing of passengers and staff alike.

‍

Project Information
Client Icon
Client
Gammon Construction Limited
Cost Icon
Cost
Location Icon
Location
Hong Kong
Date Icon
Start Date